UK Plug-In Solar Rules After SI 2026/848: 800 W Limit, Plugs and Notifying Your DNO

What changed for UK plug-in (balcony) solar from 27 August 2026: the 800 W limit, BS 1363 plug rules, DNO notification and where third-party guides disagree.

What changed on 27 August 2026

Before this date, plugging a generating device into a socket was effectively unsupported in Great Britain. SI 2026/848 amends the Plugs and Sockets etc. (Safety) Regulations 1994 and the Electricity Safety, Quality and Continuity Regulations 2002. It was made on 16 July 2026 and came into force on 27 August 2026.

A separate instrument, SI 2026/896, deals with planning for wall and ground mounted panels in England. The technical detail sits in an Interim Product Specification published by the government.

We have not checked the legal text line by line. This summary draws on three UK guides, and we flag where they disagree. Read the instrument on legislation.gov.uk before relying on any detail.

The rules in plain terms

Key points as reported by three UK guides (balconysolarhub.co.uk, plugsolarpanels.co.uk, balconysolarguide.co.uk)
TopicWhat the guides say
SizeStatute: maximum rated AC output of 800 watts. Specification: apparent power not above 800 VA, maximum 3.5 A.
PlugBS 1363 plug with a fuse of 5 A or less. Multi-way, travel and RCD adaptors are not permitted.
NotificationNotify your DNO within 28 days of commissioning, according to one guide. Another describes connect-and-notify under G98.
Number of kitsOne per household for now.
Northern IrelandThe product-safety part extends there. One guide says the grid-connection part covers Great Britain only.
Planning (England)SI 2026/896 sets projection limits and excludes listed buildings, per one guide. Another says it also covers Wales, so check.

Where the three guides contradict each other, for example on RCD requirements and on how long a kit may take to disconnect during a fault, we have left the detail out.

What it saves

One guide quotes a government estimate of £70 to £110 a year in bill savings. Another points out that the Smart Export Guarantee needs MCS certification and an export meter that plug-in kits normally lack, so you should expect no export payment and count only the power you use yourself.

Run your own figure in the UK plug-in solar calculator. For a battery on a time-of-use tariff, see Intelligent Octopus Flux vs Octopus Go.

Before you buy

  • Check that the kit appears on the Energy Networks Association type test register your guide points to.
  • Buy at or below 800 VA so you pass both figures.
  • Notify your DNO and keep the proof.
  • Do not use adaptors, extension leads or a Schuko plug.
FAQ

Frequently Asked Questions · UK Plug-in Solar

Is plug-in solar legal in the UK now? ▼
Since 27 August 2026 there is a legal route in Great Britain for kits that meet the specification, under SI 2026/848.
Is the limit 800 W or 800 VA? ▼
The regulation says 800 watts and the technical specification says 800 VA. Guides say the difference is not reconciled, so choose a kit at or below 800 VA.
Do I need to tell my network operator? ▼
Guides say yes. One says within 28 days of commissioning. Check with your DNO.
Can I get paid for exporting power? ▼
Probably not. The Smart Export Guarantee needs MCS certification and a smart meter that recorded exports, which plug-in kits usually do not have.

Sources

  1. SI 2026/848 (legislation.gov.uk) — the instrument; cited by the guides below
  2. Plug-in solar panels UK: the legal rules from 27 August 2026
  3. Is plug-in solar legal in Great Britain? Rules from 27 August 2026
  4. 800VA vs 800W: the UK plug-in solar inverter limit

More Engineering Articles